|
The airport had a small terminal building at the north end of the apron. This terminal was equipped with underfloor ventilation to prevent the accumulation of gases from the former landfill within the building. Outside, a 220-space parking lot was available free of charge to users. A drop-off area allowed passengers of the ADACmobile shuttle and taxis to board and disembark directly at the terminal. The parking lot, the terminal, and the tarmac were designed to minimize walking distances for users. |
|
The airport had a small terminal building at the north end of the apron. This terminal was equipped with underfloor ventilation to prevent the accumulation of gases from the former landfill within the building. Outside, a 220-space parking lot was available free of charge to users. A drop-off area allowed passengers of the ADACmobile shuttle and taxis to board and disembark directly at the terminal. The parking lot, the terminal, and the tarmac were designed to minimize walking distances for users. |